Project: Lock and Dam 9
Location: Guttenberg, IA
Contractor: TCI Construction
Salesperson: Jim Becker
Product: MEADOW-PATCH T2

Quantity: 1200 bags

The application consisted of repairing the vertical joint nosings along the entire length of the half-mile lock system, using the form-and-pour method.  The engineer required a polymer-modified repair mortar – this requirement was met with MEADOW-PATCH T2.  The application included extending the repair mortar at 50% by weight with 3/8” minus river bed rock and some ¾” fibers.

Lock & dam repair

joint nosing repair vertical concrete joint repair concrete joint patch

Project: Valley Ho Resort
Location: Scottsdale, Arizona
Contractor: Kitchell Contractors

Concrete Restoration - Products:
MEADOW-CRETE GPS
MEADOW-CRETE FNP
MEADOW-PATCH T1

REZI-WELD GEL PASTE
VOCOMP-20
VOCOMP-30

Originally built in 1956, Hotel Valley Ho, with its inviting pool courtyard, became a hotspot for celebrities of the era, hosting Janet Leigh and Tony Curtis; vacationing Jimmy Durante, playing the lobby piano; Zsa Zsa Gabor, filming in the area; Natalie Wood & Robert Wagner's private wedding reception; plus Bing Crosby, Marilyn Monroe, Ted Williams, Humphrey Bogart, Ingrid Bergman, and Betty Grable.

Renovations began in 2004, honoring the hotel's original mid-century spirit. Hotel Valley Ho re-opened in December 2005.

More Concrete Restoration

Project: Montgomery Ward Building 
Location: Ft. Worth, Texas
W. R. MEADOWS of TEXAS - Salesrep: Reggie Hill
Architect: Hodges & Associates / Contractor: Thomas S. Byrne, LTD
MEADOWS Products:
Repair Mortars / Grouts
- MEADOW-CRETE® FNP, MEADOW-PATCH™ T1, CG-86 Grout

Vacant 8 story building

Demolition work

Repair work begins

Concrete patching / restoration

Restoration work continues

Exterior walls repaired